Signalling Changes

IMG_1183

The MPL signal system has seen a few changes this week. Most obvious is the new intermediate signal at the base of the climb to Timber Creek, for northward movements through the “Mogollon” block. Meanwhile, the absolute signal at the Ogden tunnel portal has been removed – this means movement through staging is governed by signals at Control Point North Hill Valley.

Our “open house” mode has also been reprogrammed. The signals should no longer lock up at Stop when running bidirectionally without a dispatcher.

This entry was posted in Projects-General. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s