Author Archives: Nicholas Connelly

Signalling Changes

The MPL signal system has seen a few changes this week. Most obvious is the new intermediate signal at the base of the climb to Timber Creek, for northward movements through the “Mogollon” block. Meanwhile, the absolute signal at the … Continue reading

Posted in Projects-General | Leave a comment

CTC Installation: Sunset to Page

As of tonight, Centralized Traffic Control is in effect from Sunset (the station formerly known as Switch 10) to Page.  Control Points have been installed and programmed from Sunset to North Hill Valley,  with an intermediate signal at the Page … Continue reading

Posted in Uncategorized | Leave a comment